WRCP attended the recent Indonesian Petroleum Association’s 46th Convention and Exhibition held in Jakarta, Indonesia last September 21 to 23, 2022 to support its distributor, PT Rigspek Perkasa.
WRCP along with DMCI and NLEX Corporation lifts four prefabricated 120-Metric Tons steel box girder with a span of 60 meters is installed above the LRT Line 1 Blumentritt Station last March 3-5, 2022. The complex lift requires four pieces of 57mm wire rope slings with a working load limit of 36.0 tons on a…
Our story….
The complicated lift required a minimum capacity of 80 metric tons, WRCP provided 4 pieces of 64mm wire rope with a working load limit of 52 metric tons in a straight vertical lift. The space available only allowed for a 60o four-legged sling lift. This meant manufacturing 4 custom 64 mm slings, each with a capacity…
It’s official. We have received our updated certificate!???
Wire Rope Corporation of the Philippines conducted the first of its periodic invitation-only seminars for 2019 for major customers and dealers in the Batangas area last March 15, 2019 Please contact our Manila Sales Office to find out if your company is eligible for inclusion in the invitation list.
As the year comes to a close, WRCP takes a look back and makes plans for a brighter future. Season’s Greetings from the WRCP family !
You must be logged in to post a comment.